The handover date does not move when the trades run late. The final clean absorbs every delay upstream of it, then gets judged on a walkthrough with a torch. Residential builds, fitouts, commercial projects and multi-unit handovers, across seven regions.

Rough, builders and sparkle stages scoped separately, with dust vacuumed and wiped rather than swept or blown around. We work seven days, 6am to 10pm, and quote after a site walkthrough.

  • Dust vacuumed and wiped, never blown around
  • Defects photographed and listed at handover
  • Seven days, 6am to 10pm, around your programme
6am to 10pm
Seven days, plus a 24-hour emergency line
We stay until you're happy
Our guarantee on every clean
$10M
Public liability insurance
Free quotes
Fixed before we start

What is the difference between a rough clean, a builders clean and a sparkle?

Three different jobs at three different points in the programme. Lumping them into one number satisfies nobody.

Rough clean. During construction, once the messy trades are through. Debris, packaging, offcuts and loose fixings cleared so the next trade can work safely.

Builders clean. After the trades finish, and this is the long one. Every surface, inside every cupboard, glass, tracks, protective film, stickers, paint splatter and grout haze.

Sparkle. Immediately before the walkthrough. Fingerprints, final glass and the marks that appeared while the last trades were tidying up.

For sheds and industrial handovers see warehouse and industrial cleaning. For a tenancy going back to a landlord rather than a new build, see end of lease cleaning.

Where does the clean sit in your build programme?

At the end, which is why it gets squeezed. We plan for that, seven days a week from 6am to 10pm.

Booked to a date

Locked in against your programme, with crew size set to the window rather than the other way around.

Moved at short notice

Programmes slip. We hold the slot and re-crew, using early starts, evenings and weekends inside our hours.

Staged across a project

Multi-unit and staged handovers cleaned building by building as each one comes off the programme.

How does the clean get signed off before handover?

You should not be finding our misses on the same walkthrough as the client.

Contact us
  1. Step 01

    Scope agreed to the stage

    Which stage, which areas, and what condition the site will be in when we arrive.

  2. Step 02

    Cleaned and self-checked

    Our supervisor walks it with a torch before you do, in the same light the client will use.

  3. Step 03

    Handover report issued

    Photographs by area, plus a list of damage and defects we found that are not ours.

  4. Step 04

    Touch-up before the client

    Anything you flag gets fixed before the walkthrough rather than after it.

What does a builders clean cover?

The long stage, set out in writing so nothing is assumed either way.

Surfaces and joinery

  • Inside every cupboard and drawer
  • Benchtops, splashbacks and edges
  • Skirting, architraves and door tops
  • Appliance interiors and exteriors
  • Stickers and adhesive residue

Glass and openings

  • Protective film removed
  • Render, paint and silicone off glass
  • Tracks, frames and weep holes
  • Mirrors and shower screens
  • Flyscreens and door seals

Floors and wet areas

  • Grout haze removed
  • Paint and adhesive off tile
  • Timber and vinyl cleaned to finish
  • Silicone smears trimmed back
  • Drain grates cleared

Where handovers fail

  • Window tracks nobody vacuumed
  • Dust on top of doors and robes
  • Light fittings and exhaust fan covers
  • Marks behind door swings
  • Nails and screws in patio gaps

Blades are never used on glass. A scratched pane costs more than the clean and cannot be undone.

What does a site supervisor get before we arrive?

Lodged ahead of the first day, not at the gate.

Site documentation

  • Safe Work Method Statements per task
  • Dust control method
  • Site-specific risk assessment
  • Safety Data Sheets for every product

On site

  • Your site induction before first entry
  • Sign in and out with your supervisor
  • Incident reporting process
  • Photo handover report at the end

Why does construction dust behave differently around Australia?

Fine dust is the whole job on a builders clean, and what it does after you disturb it depends on the air it lands in.

  • Perth and Adelaide. Dry air keeps fine dust moving. A unit cleaned on Tuesday can look dusty again by Thursday if the site next door is still active.
  • Darwin. The wet season slows external trades, then much of the programme compresses into the dry. Handovers stack up and the cleaning window shrinks with them.
  • Humid weather generally. Dust binds to fresh render and new glass rather than sitting loose on it, so it needs wet methods as well as vacuuming.
  • Coastal sites. Salt settles on new glass and frames soon after the scaffold comes down, which is why the sparkle stage exists at all.

We schedule the sparkle stage as close to the walkthrough as your programme allows, for exactly this reason.

Why does the final clean always get squeezed?

Four things that decide whether the last job on the programme saves a handover or sinks one.

Dust removed, not moved around

A broom or a blower lifts fine dust into the air, and it settles straight back onto the surfaces you just cleaned.

We vacuum and wipe instead, so the dust leaves the building rather than moving around inside it. Silica dust extraction from cutting and grinding is part of the builders clean when your site needs it, quoted with the stage.

Three stages, scoped separately

Rough, builders and sparkle are different jobs with different hours. Quoting them as one number is how a builders clean gets done to rough clean depth and fails at walkthrough.

You see each stage on its own line. Book one, two or all three, and know exactly what each covers before the programme starts moving.

Crews that can move when the programme slips

Waterproofing reworks, late joinery and a failed inspection all land on the last trade in the sequence, which is us.

We hold the slot and re-crew, using early mornings from 6am, evenings until 10pm and weekends to catch up.

A handover record with the defects we found

Our crews are the last people through before your client, working in empty rooms with good light. They see everything, including things that have nothing to do with cleaning.

You get photographs by area, plus a list of damage and defects that are not cleaning issues. Fixing those before the walkthrough costs far less than arguing about them later.

The cleaner is the last trade on site and the first one blamed. The difference is whether there is a record of what the rooms looked like.

What backs a crew on your site at the last minute?

Your settlement date depends on this going right.

Dust control method first

Vacuum and wet methods, documented in a SWMS.

Seven days, 6am to 10pm

Early starts, evenings and weekends when the programme slips.

Equipment and chemicals supplied

The right solvents for paint, render and haze.

$10 million public liability

Cover in place before we set foot on site.

Defects reported

Listed and photographed, not cleaned over.

A Shining Services cleaner working through a hotel corridor after hours

Self-checked with a torch

Before you walk it, in the same light.

What do our customers say about us?

How is a builders clean quote worked out?

Four steps, each stage on its own line.

Site walkthrough

Stage, floor area, glazing and the condition we should expect.

Scope by stage

Rough, builders and sparkle each quoted on their own line.

Documents and induction

SWMS pack, dust control method and your site induction.

Clean and handover report

Self-checked, then photographed by area with a defects list.

Condition at arrival matters more than floor area. A site handed over swept and free of debris is a different job from one with packaging still in the rooms. A builders clean on a site that never had a rough clean takes much longer.

Multi-unit and staged projects are quoted as one program, so the terms hold across every handover.

Request a site walkthrough

What else gets done before the client walks through?

Booked alongside the stages, not discovered on the day.

Site amenities

Site sheds, lunchrooms and toilets during the build.

Post-handover touch-up

For settlements that slip after the sparkle stage.

Which regions do we cover?

New builds, townhouses, apartments, commercial fitouts and renovations in Darwin, Perth, Sydney, Melbourne, Brisbane, Adelaide and Tasmania. Tell us the address and we will arrange a walkthrough.

Darwin, Northern Territory

Northern Territory

Darwin

36+ suburbs covered

Open today

Serving the Top End with professional cleaning services across Darwin and surrounding areas.

  • CBD
  • Parap
  • Nightcliff
  • Casuarina
  • Palmerston
  • Stuart Park
  • Fannie Bay
  • Larrakeyah
  • +28 more

Perth, Western Australia

35+ suburbs covered

Open today
  • Perth CBD
  • Subiaco
  • Nedlands
  • +32 more
  • Mining industry facilities
  • Team based in Wellard

Sydney, New South Wales

36+ suburbs covered

Open today
  • Sydney CBD
  • Bondi
  • Manly
  • +33 more
  • Harbor view properties
  • Team based in Sydney

Melbourne, Victoria

36+ suburbs covered

Open today
  • Melbourne CBD
  • South Yarra
  • Fitzroy
  • +33 more
  • High-rise building cleaning
  • Team based in Melbourne

Brisbane, Queensland

36+ suburbs covered

Open today
  • Brisbane CBD
  • Fortitude Valley
  • South Bank
  • +33 more
  • Sub-tropical climate cleaning
  • Team based in Stafford Heights

Adelaide, South Australia

36+ suburbs covered

Open today
  • Adelaide CBD
  • North Adelaide
  • Glenelg
  • +33 more
  • Historical building restoration
  • Team based in Marleston

Darwin City

93 Smith St

What do builders ask before they book a final clean?

What is the difference between a rough clean and a final clean?

A rough clean happens during construction, clearing debris, packaging and offcuts so the next trade can work. A builders or final clean happens after the trades finish and covers every surface, inside every cupboard, glass, tracks, film, stickers and haze. They are different jobs, which is why we quote them separately.

How long does a builders clean take?

It depends most on the condition at arrival, then on size and finish. We give you crew hours with the quote after the walkthrough, so you can plan the programme around them.

Do you remove paint, render and grout haze?

Yes, and that is most of what a builders clean is. Paint splatter, render, adhesive, silicone smears and grout haze come off with the right solvents and technique, and we never use blades on glass.

Do you extract silica dust?

Yes. Silica dust extraction is offered as part of the builders clean, using extraction and wet methods rather than a broom or a blower, and it is quoted with the stage once we have walked the site.

Can you work while other trades are still on site?

Yes for the rough stage, which is designed for that. The builders and sparkle stages need the trades finished, and we will tell you if a date is too early rather than take the booking.

What happens if the handover date moves?

We hold the slot and re-crew. We work seven days from 6am to 10pm, so early starts, evenings and weekends help catch up when the programme slips.

What paperwork do you provide for site?

Safe Work Method Statements for each task, a dust control method, a site-specific risk assessment and Safety Data Sheets, all lodged before we arrive. Every crew member completes your site induction before first entry.

We stay until it's right

Our cleaners don't leave until you're happy with the work. For end of lease cleans, if you're not satisfied and tell us within 72 hours, we come back and re-clean.

Ready to lock in the last job on the programme?

Tell us about the project and we will arrange a walkthrough and a free quote by stage.

  • Reply within 2 hours
  • No lock-in contracts
  • Open 6am to 10pm, 7 days
Call 0483 982 111

Monday to Sunday: 6:00 AM - 10:00 PM

Multiple Locations

Total square footage of construction area

Check if construction debris removal is needed

When is the construction project expected to be completed?

Call Now